Muhammad Munif, Langlang Gumilar, Arif Nur Afandi
Distribution of electric power in a building is a power distribution circuit system starting from power sources, transformers, distribution networks to the load with all its aspects in such a way that the quality of service and comfort of the building can be maintained properly and optimally, efficiently and economically. Therefore it is necessary to analyze the performance of the electric power system at Sentani Jayapura airport. The Sentani Jayapura Airport electric power system uses a combined PLN and generator supply as a source of electric power. In this power system there are 4 transformers with 3 main transformers and 1 backup transformer. This transformer transformer is connected to the load according to the design that has been made. To find out the problems in this electric power system, an analysis is carried out. In this study, the analysis includes voltage drop and short circuit analysis. The analysis is carried out using existing specifications and systems and is carried out by performing calculations at full load. Then a simulation is carried out as a comparison of manual calculations. © 2023 IEEE.
Universitas Negeri Malang, Department Electrical Engineering, Malang, Indonesia